Nanjing Shidai Green Energy Operation Command Center Large Screen Construction Project

Project Name: Nanjing Shidai Green Energy Operation Command Center Large Screen Construction Project
Construction Unit: Stonbel Technology Co., Ltd.

Project Background

Serving as the core hub for energy dispatching, real-time monitoring, operation maintenance and emergency consultation, the Nanjing Shidai Green Energy Operation Command Center handles energy data visualization, equipment status tracking, cross-department coordination and emergency response. The old display system suffered from low resolution, visible splicing seams and poor stability for continuous operation, failing to support centralized presentation of massive energy data under 7×24-hour duty. This project delivers an integrated LED fine-pitch visualization platform with high definition and reliability to support energy supervision, decision-making and emergency collaboration.

Core Project Configuration

Tailored for 7×24-hour big-data visualization in energy command scenarios, Stonbel provides an integrated oversized LED main display solution:
  • Core Main Display System: A P1.25 LED fine-pitch screen of 11.52m × 2.4m. With micron-level pixel pitch, it presents sharp, grain-free images. It displays energy pipeline data, equipment status, GIS layers, alarms and statistical reports, supporting full-screen display, partition windowing and signal overlay for long-distance viewing and detailed data reading.

  • Auxiliary System: Dedicated power supply and heat dissipation modules ensure stable round-the-clock operation. Supporting management software enables auto brightness adjustment and online device monitoring for easy maintenance.

Project Implementation

Stonbel assigned a dedicated visualization technical team. Based on the room dimensions, viewing distance and cabling conditions, we designed the steel frame and screen layout to guarantee flatness and uniform viewing angles. Optimized power loops, heat dissipation and separated strong/weak-current wiring were deployed for continuous operation. Phased construction minimized disruption to daily command operations. After hardware installation, we completed joint commissioning, color & brightness calibration and signal latency tuning to ensure smooth system performance.

Project Achievements

Configure a professional conference host, supporting seamless switching of multiple signals, high-definition docking of remote conferences and seat partition management, adapting to multi-person and multi-scenario conference scheduling; Equipped with a professional sound reinforcement system, it realizes high-definition and lossless audio transmission and balanced sound reinforcement, ensuring clear, coherent and interference-free sound for remote and on-site conferences, and fully meeting the audio-visual collaboration needs of various high-end conference scenarios.


Upgraded Display Experience

The 11.52m × 2.4m P1.25 fine-pitch LED screen visualizes massive energy metrics, equipment status and alerts with crisp charts and video, improving data reading efficiency for dispatchers.

Improved Dispatching Efficiency: The video controller supports multi-signal window roaming and instant switching. Energy monitoring, video feeds and meeting contents can be shown together, accelerating cross-department remote consultation and emergency judgment for faster decision-making.


Enhanced Scenario Adaptability

The system supports 7×24-hour continuous operation with self-check and simple maintenance. It covers daily energy monitoring, routine meetings and emergency command, fully meeting operational needs of Nanjing Shidai Green Energy and winning positive feedback from the client.

微信图片_20260928093911_888_20.jpgScreenShot_2026-10-14_172329_645.png